Home / Portfolio / Commercial Projects /
Commercial Locker Room Renovation at the YMCA in Manchester, NH

J-TEK Construction completed a commercial locker room renovation for the YMCA in Manchester, NH, transforming an aging, heavily used space into a cleaner, brighter, and more functional facility for members and staff.
The renovation included extensive demolition and reconstruction, new durable flooring, updated ceilings and lighting, refreshed walls and finishes, improved changing areas, updated sinks and fixtures, new benches, and refinished locker areas. The finished space was designed to withstand the demands of a high-traffic community fitness facility while providing a modern, welcoming environment.
Project Overview
With more than 30 years of construction experience, owner Jimmy Lehoux led the YMCA locker room renovation from start to finish, coordinating the demolition, construction, facility improvements, and finish work required to completely update the space.
The Project
The YMCA partnered with J-TEK Construction to renovate its locker room facility in Manchester, NH, updating an aging space that experiences heavy daily use. The project required extensive demolition and reconstruction while working around existing locker areas, plumbing, electrical components, mechanical systems, and other building infrastructure.
Because this is a heavily used community fitness facility, the renovation needed to address more than appearance. The rebuilt space needed durable materials, functional changing and wash areas, improved lighting, and finishes capable of handling frequent daily use by YMCA members and staff.
Construction Process
The project began with demolition of the existing locker room finishes. Flooring was removed throughout large portions of the space, and sections of the suspended ceiling were taken down, exposing ductwork, piping, electrical components, and other systems above the ceiling.
With the space opened up, J-TEK coordinated the construction and improvements needed before new finishes could be installed. The progress photos show extensive work taking place around the existing lockers, sink areas, restrooms, ceilings, and mechanical systems while the locker room was rebuilt.
The finishing phase brought the space back together with new durable flooring, reconstructed ceilings, updated lighting, refreshed walls, new benches, updated sink areas and fixtures, and refinished locker areas. The result is a completely refreshed locker room built to handle frequent use while providing YMCA members with a cleaner and more welcoming environment.





Before & During Construction
The photos below show the extent of the work required to transform the YMCA locker room. Existing flooring and ceiling materials were removed, exposing the underlying floor surfaces and the network of ductwork, piping, electrical components, and structural elements above the space.
As demolition progressed, J-TEK worked throughout the locker, changing, sink, and restroom areas to prepare the facility for reconstruction. These progress photos provide a behind-the-scenes look at the amount of commercial construction work that took place before the new flooring, ceilings, lighting, walls, fixtures, and finishes could be installed.
The contrast between the construction photos and completed facility shows how extensively the locker room was transformed, from an aging interior undergoing major demolition to a bright, durable, and updated space ready for daily use.
Finished Project
The completed renovation transformed the YMCA locker room into a bright, clean, and modern space designed for the demands of daily use. New durable flooring extends throughout the facility, while updated ceilings, lighting, wall finishes, sinks, changing areas, benches, and refreshed lockers give the space a completely updated appearance.
By combining extensive reconstruction with durable commercial finishes, J-TEK Construction delivered a locker room that is more functional, easier to maintain, and better suited for a busy fitness and community facility. The renovated space now provides YMCA members and staff with a welcoming environment built to withstand years of high-traffic use.






Commercial Construction Services Provided
This project brought together several areas of commercial construction expertise to completely renovate the YMCA locker room and create a durable, functional space designed for heavy daily use.
Services completed during this project included:
- Commercial Locker Room Renovation
- Interior Demolition & Reconstruction
- Ceiling Demolition & Reconstruction
- Flooring Removal & Installation
- Lighting & Ceiling Improvements
- Plumbing & Fixture Coordination
- Sink & Wash Area Improvements
- Changing Area Renovations
- Interior Wall & Finish Work
- Locker Area Improvements
- Commercial Painting
- Construction Project Management
- Final Finish Work
About the YMCA of Downtown Manchester
The YMCA of Downtown Manchester is a community organization serving individuals and families in Manchester, New Hampshire through fitness, wellness, youth development, and community programs. Its facilities support a wide range of members and activities, making durable, functional spaces an important part of the everyday member experience.
The renovated locker room provides an updated environment designed to better serve YMCA members, staff, and visitors while supporting the facility’s ongoing fitness and community programs.
Related Commercial Construction Projects
Planning a commercial renovation of your own? Explore more completed J-TEK Construction projects and see how we’ve helped businesses and organizations throughout Manchester and Southern New Hampshire improve and transform their facilities.
- Medical Office Renovation at Bedford Ambulatory Surgical Center
- Church Sanctuary & Choir Loft Renovation at St. Peter Church
- Commercial Office Build-Out for Jumpp Chiropractic
Frequently Asked Questions
Why Businesses Choose J-Tek Construction

More Projects
-

Commercial Deck Construction at the Palace Theatre in Manchester, NH
Read More →
-

Medical Facility Renovation at Bedford Ambulatory Surgical Center in Bedford, NH
Read More →
-

Commercial Office Renovation for Affinity Investment Group in Exeter, NH
Read More →














